The government allocated more than 7 billion hryvnias for the restoration of the energy system
- Author:
- Olha Bereziuk
- Date:
At the meeting on May 10, the Cabinet of Ministers allocated 7 billion 168 million hryvnias for the reconstruction of the energy system.
This was reported by the Prime Minister Denys Shmyhal.
These funds will be used to purchase equipment for the restoration of the high-voltage network, as well as for better synchronization of the energy systems of Ukraine and the EU.
The Prime Minister emphasized that grants for the implementation of this project were provided by the World Bank.
He also noted that the current situation in the energy sector is one of the most difficult, network and generation repairs are ongoing 24/7.
"However, in April we had to import a third more electricity than in March. ʼUkrenergoʼ constantly attracts help from our neighbors. Therefore, I once again call for saving electricity, especially in the evening," Shmyhal said.
- On the night of May 8, Russian troops massively attacked Ukraine with missiles and drones. The targets were power generation and transmission facilities in Poltava, Kirovohrad, Zaporizhzhia, Lviv, Ivano-Frankivsk and Vinnytsia regions.
- After the attack, Great Britain informed about the allocation of €23 million to restore Ukraineʼs energy system, and Germany will provide €45 million.